Silimela, Tubatse Substation
Project Details:
Client: ESKOM
Discipline: Environmental and Scientific Studies
Category: Energy
Location: Silimela, Limpopo
Key project Details: Environmental Control Officer (ECO) for the Silimela and Tubatse Switching Station and the associated transmission lines.
Thero Services was appointed by Eskom to handle environmental services for various power line construction projects in Limpopo and Mpumalanga as part of the Northern Grid Strengthening project. These projects encompassed a range of power lines and substations Including:
Silimela Manogeng 400kV Overhead Transmission Line
Tubatse Manogeng 400kV Overhead Line
Manogeng Switching Station
Tubatse Substation
Thero Services assumed responsibility for overseeing a workforce exceeding 1000 individuals on-site as an Environmental Control Officer . This involved conducting inductions, providing training sessions in compliance with the Environmental requirements of the project. Additionally, their mandate extended to managing the Environmental Control Officer (ECO) functions of the projects, including implementing conditions outlined in the Environmental Authorisation, Environmental Management Plan, and Project Environmental Permits and Approvals such as heritage Permits, Vegetation Permits, Access Documents.
Thero Services' role also encompassed fulfilling Ecological functions essential to project compliance. This included managing the implementation of biodiversity offset programs, conducting vegetation assessments and management activities, and conducting environmental surveys. Through these multifaceted responsibilities, Thero Services played a crucial role in ensuring both the environmental integrity and operational efficiency of the powerline construction projects.